Roof replacement in New Orleans
Roof replacement in New Orleans: the whole job, start to finish
A full replacement is a tear-off down to the deck, a check of every board underneath, and a new roofing system built back up. In New Orleans the build-back is where the money is made or lost: this is your one chance, for the next 20 years, to seal the deck, fix the flashing details, and decide whether the roof goes back FORTIFIED.
How the job runs
- Measure and inspect. The company measures the roof, checks the deck and attic ventilation, and photographs the problem areas.
- Written price. You get a stated price — not a range, not a verbal — before anyone tears off a shingle.
- Tear-off and deck repair. Old material comes off. Rotten decking — common in older New Orleans housing stock — is replaced per board at the agreed rate.
- The system goes on. Underlayment (a sealed deck if you choose FORTIFIED), drip edge, starter, field material, ridge, and flashing.
- Cleanup and walkthrough. Magnet sweep for nails, gutters cleared, and a walkthrough of the finished work.
Most single-family replacements in the metro finish in one to three days of actual roofing, weather permitting — and in New Orleans, weather always has a vote. Schedule around the forecast, not against it.
When replacement beats repair
- The roof is 15+ years old and losing granules across whole slopes, not one spot
- Leaks keep appearing in new places after each fix
- A storm lifted or creased shingles across a full slope
- You're about to pay for a second major repair in three years
Price my roof replacement.
One local New Orleans roofing company reads exactly what you send and prices your actual roof.
1. You submit → 2. We pass it along, exactly as entered → 3. One local company receives it
NewOrleansRooferNearMe.com is not a roofing company and does not install roofs.
The decision to make before tear-off day
Adding the FORTIFIED package during a replacement costs a fraction of what it costs as a retrofit, because the deck is already exposed. If there's any chance you'll do it, decide before the old roof comes off — the sealed deck and edge work happen in the first hours of the job. (see that page)